Showing posts with label FTA. Show all posts
Showing posts with label FTA. Show all posts

Sunday, January 13, 2013

Final week for FTA Transit Asset Management dialog

National Online Dialogue on Transit Asset Management

One of the new requirements in the Moving Ahead for Progress in the 21st Century Act (MAP-21) is that of Transit Asset Management (TAM). The purpose of this National Online Dialogue on TAM (December 12, 2012 to January 18, 2013) is to provide the Federal Transit Administration’s partners and stakeholders the opportunity to discuss and provide suggestions on some of the key questions surrounding TAM (standard practices in the industry, framing definitions, etc.) including:

  • How should FTA define State of Good Repair?
  • What elements should be included in a Transit Asset Management Plan?
  • How will I know my Transit Asset Management Plan meets FTA requirements?
  • What triggers when I have to revise my Transit Asset Management Plan?
  • Should FTA tailor Transit Asset Management Plan requirements to accommodate different sized transit systems to avoid the “one size fits all” approach?
  • What kinds of technical assistance should FTA offer to aid transit agencies in meeting these requirements?
  • How should the requirement for state of good repair performance measures be implemented and integrated with the new MAP-21 performance-based planning process?
  • Other topics you believe should be considered as we prepare the TAM rulemaking.
Comments will also be taken when the rulemaking is published in the Federal Register.

You can download the informational National Online Dialogue flyer here (link to more detailed flyer or promotional webpage).

Background Material
In response to the establishment of MAP-21, FTA put together a wealth of material on its website, www.fta.dot.gov/map21, to help clarify new or changing programs. A list of frequently asked questions can be found there as well as past MAP-21 webinars, outreach opportunities, summaries, powerpoints and fact sheets. The program fact sheets for TAM and for Metropolitan & Statewide and Nonmetropolitan Transportation Planning in particular will be a useful resource to review in advance of participating in the online dialogue.

PLEASE REGISTER TO GIVE US AN IDEA, COMMENT ON ANOTHER IDEA OR VOTE ON AN IDEA by clicking on the register link at the top right of the page or scrolling down to click on the submit a new idea button.

Once you have registered and logged in:
  1. Please review the Campaign Areas to the left or browse the ideas below.
  2. Pick the Campaign Area or idea of your choice and click on it. Then select the “Submit New Idea” Button to share an idea.
  3. Comment or vote on someone else’s idea.
  4. Encourage other transportation professionals to join the dialogue and share experiences

CHECK BACK FREQUENTLY
New questions and comments will be continually posted so please check back often and contribute.
Need assistance? For questions or problems joining this dialogue contact Crystal.Frederick@dot.gov 

Friday, June 22, 2012

M-1 Light Rail Held in Check by FTA

U.S. Transportation Secretary Ray LaHood did not feel the M-1 Light Rail project has a sustainable life beyond the initial start-up period. Of the problems listed:

  • Credible financing for short & long term - it simply doesn't look like a sustainable plan for 25 years and beyond.
  • Plans need to include provisions for cost overruns.
  • Assurance that whatever organization that received grant monies will control M-1 and be able to manage its needs daily, weekly, and longer term.
  • A regional transit authority is required to serve needs to the greater area.
The plan will also run into resistance when acquiring the land along the route and delays it will create for business and residents.

Sunday, June 17, 2012

DDOT Gets AVL Working

Response to Detroit bus system uses tracking for smoother operations, Detroit News, 06/17/2012
Opinion by Stephen Boyle

Tracking technology has been corroding on the buses, signals broadcast waiting to be heard. When buses arrive into the fleet they come with AVL equipment. DDOT has gone through maintenance to resurrect units to get them back online.

The elimination of buses and elongating of service times for route times outside "core hours" has wiped out jobs, placed people on dark streets walking miles home, and it isn't like they can call a taxi - doing that wipes out any income from a job.

The article mentions creating a phone app to know when the next bus is coming. This is great news - for those that have a smart phone! Phone technology when you have a basic job or searching for one isn't likely able to run Android/iPhone apps. It has to get down to text messages to serve basic needs foremost. Some still have a limit in number of text messages they can receive in a month. If you keep meeting a bar set too high you'll continue to claim to hit a mark, but fail to hear from those you missed.

The FTA requires filing an Equity Analysis before making major service changes or raising fares. Detroit Department of Transportation did NOT file an Equity Analysis BEFORE making changes. These changes were pushed on the people with a 10 day notice (receiving no fanfare by the press, this is NORMAL for the Detroit Press Secretary - they want nobody to know, nobody to show!). Public transportation is an area the City of Detroit has been getting a black eye in for decades. During these same years elected officials have used the law as a guide rather than the framework for how to operate, choosing to ignore the law when it doesn't fit their master plan created in closed door sessions with corporate executives. The people have largely not stepped up and filed ethics complaints, this has to stop now and people need to hold elected officials to an ethical standard that serves the PEOPLE, not the corporate interests intent on enslaving the people.

If all DDOT can serve is core hours then you serve those whom are working - you missed a segment of your target audience for Federal grant funding [Job Access / Reverse Commute Programs (Section 3037)]. Maybe if DDOT focused on abiding by the federal & state programs they would have more operating capital. The feds don't want to offer it because DDOT hasn't delivered in the programs as requested. Getting the AVL working is a REQUIREMENT for federal funding - there are MORE REQUIREMENTS.

Work on the basics please!!! The Envisurage contract was illegally created behind closed doors as a way for the Mayor to sell-out the city assets. The goal since last year was to move public transportation into privatized hands, which creates a question - will a private firm service the public needs - NOOO!!  The Detroit Bus Company is an example, that fledgling bus system serves party people on the weekends, it isn't out to serve working people.

Once the people are out of the way city officials can interpret the rule of law as they would like and subject the people to that interpretation. This is how some of our law enforcement happens - the officer says "you can't do that", and most people comply with the request. Some people know their rights and question that authority knowing full well the officer is bluffing and expecting compliance.

From the preamble of the City Charter...
The people have a right to expect city government to provide for its residents, decent housing; job opportunities; reliable, convenient and comfortable transportation; recreational facilities and activities; cultural enrichment, including libraries and art and historical museums; clean air and waterways, safe drinking water and a sanitary, environmentally sound city.

Monday, June 4, 2012

DCPE for Transit Stakeholders


Detroit Department of Transportation

Public Announcement

May 18, 2012
ATTENTION: STAKEHOLDERS OF ELDERLY, DISABLED, AND LOWER-INCOME TRANSPORTATION SERVICES.
REGARDING: 2012 – DM1 FEEDBACK PACKET – FEDERAL GRANT FUNDING AVAILABILITY

On May 18, 2012, the Detroit Department of Transportation (DDOT) hosted its annual Detroit’s Coordination Planning Event (DCPE) to gather with area stakeholders to discuss service improvements it has planned for Detroit’s elderly, disabled, and lower- income riders (target-riders). DCPE was DDOT’s opportunity to present the programs it proposes to achieve a customer-focused, high-quality, and cost-effective transit service; and to obtain feedback from stakeholders on ways to continue improving area services.

Moving forward, target-riders services will be coordinated through DDOT’s new Detroit Mobility 1st (DM1) service, which is funded by multiple funding sources. In an effort to secure grant funding from the Federal Transit Administration’s Elderly Individuals and Individuals with Disabilities (5310), Job Access / Reverse Commute (5316), and New Freedom (5317) grant programs to assist with improving target-rider services, DDOT is seeking the following:

  • Additional feedback from area stakeholders on that which was proposed as the most effective alternative for satisfying area rider’s needs: and/or
  • The presentation of grant proposals that enhance, extend or replace existing programs/services.

If you are interested in assisting in these efforts, please obtain a 2012 DM1 Feedback Packet, which includes DDOT’s proposal and the required feedback survey, by downloading it from DDOT’s website at: www.RideDetroitTransit.com; or by calling DM1’s Customer Care office at (313) 933-1300 and selecting options “2” and “3” to request a mailed copy.

For assistance with completing the survey, or grant proposal, please feel free to contact DM1’s Mobility Center at: (313) 833-0477. Completed surveys and grant proposals must be submitted to DDOT by June 18, 2012.

We look forward to your anticipated assistance with securing funding for area riders.

Sincerely,
DDOT's Grant Facilitator


Click here to view and download the DM1 2012 Feedback Packet